AviaHub MRO — Nowe Kramsko

A European competence centre for the digital modernisation of aircraft.

Role in the group
MRO competence centre · fund commitment to the non-grant portion, max. PLN 100 million
Stage
Conditional commitment · the grant has not yet been awarded
Location
Nowe Kramsko, Lubusz Voivodeship, Poland
169.6PLN m
Total project budget
61.06%
Public co-financing of eligible costs
100PLN m
Maximum commitment of the fund

Infrastructure

A European competence centre for the digital modernisation of aircraft

AviaHub MRO at Nowe Kramsko is an OEM-independent facility intended for the Airbus A330, Boeing 737 and Embraer 190. The total budget is PLN 169.6 million and public co-financing covers 61.06% of eligible costs.

Scope of work

What the centre is equipped for

  • SATCOM and LEO connectivity, PNT systems and CNS/ATM.

  • Integrated modular avionics and cyber security.

  • AI-assisted drone inspection and paperless maintenance.

Financing

Breakdown of the total budget

ComponentShare of the total budget
Public co-financing50%
Non-grant portion (the fund's role)31%
Ineligible costs19%

The shares are calculated from the total budget of PLN 169.6 million including ineligible costs; the 61.06% co-financing rate applies to eligible costs only.

Why the structure is conservative

The fund is not financing the project in the hope that the grant arrives. The commitment covers the portion the grant does not reach, and it can be drawn only after the award decision.

Until then it is a conditional commitment, not deployed capital — which is why AviaHub appears in the pipeline at its maximum amount rather than at a drawn amount.

What has not yet been decided

  • The grant has not yet been awarded; until the decision, the fund's commitment is conditional and undrawn.

  • The 61.06% rate applies to eligible costs only; ineligible costs account for 19% of the total budget.

  • The PLN 100 million figure is the maximum amount of the commitment, not deployed capital.

The 61.06% co-financing rate applies to eligible costs; the budget breakdown is stated including ineligible costs. The grant has not yet been awarded.

Overview

Key details

Location
Nowe Kramsko, Lubusz Voivodeship, Poland
Total budget
PLN 169.6 million
Public co-financing
61.06% of eligible costs
Fund commitment
The non-grant portion, up to PLN 100 million
Trigger
Exposure arises only once the grant has been awarded
Aircraft types
Airbus A330, Boeing 737, Embraer 190 — independently of the OEM

The public co-financing has not yet been awarded. Until the award decision this is a conditional commitment of the fund of up to PLN 100 million, not a drawn amount, and delivery of the project depends on the grant being awarded.

The detail sits in the data room

Investment studies, contractual documentation and the data room are made available to qualified investors after an initial meeting and the signing of an NDA.

Request a consultation

Put the strength of global investment to work for your success.